Project presentation:

Location: Borma Tataouine – Babes Gannouch

October 2015

OMV (Austrian company) and ETAP have subcontracted the southern gas project (Nawara project) to the company GIE Bouchamaouî Streicher Nawara Pipeline to carry out the gas transport pipeline from the CPF station in Nawara to the GTP station in Gabes. The total length of the channel is 375 km and has a diameter of 24 inches.

Our mission: 

Production of a construction site follow-through film.

Aerial footage of the project.

Construction site follow-through

The construction will take more than two years of pipeline installation work between Borma and Gabes.

Project objectives:

Promote technical and human resources

Supervision and monitoring of the cathodic protection system realization of the Nawara pipeline project

Showcase the different techniques used during construction and illustrate engineering records and construction reports.

About the project

Nawara pipeline
(Gie Bouchamaoui Streicher)

Filming crew:
DOP – Director – Director’s assistant
Cameramen – Drone pilot

Authorizations:
Air flight authorization (drone)