Project presentation:

Project Ashtart field export solution for SEREPT

The connection of a temporary FSE: Thapsus (owned by SAR) to the PC2 CALM buoy

Ensure the loading and unloading operations of the oil produced by the ASHTART field via Thapsus fso for six months.

Our mission: 

Film the operation of the disconnection of mud, chains, and towing of the IFR barge Ill.

Project objectives: 

Promote technical and human resources

Showcase the realizations and techniques used in this mission.

About the project

Ashtart field
(lfrikia ll Disconnection- 2015)

Filming crew:
DOP – Director – Director’s assistant
Cameramen – Drone pilot

Authorizations:
Air flight authorization (drone)