Construction site follow-through

December 2020

Project presentation:

COLAS RAIL develops, starts, & integrates the construction of the first two Tunisian fast RFR train lines, the whole set of rail specialties, to obtain an urban & modern transportation project.

Our mission consists of following through with the project’s construction for eight months, starting from December 2020 and ending in July 2021.

The making of Tunis’ RFR project first part of 18.5 km in length is (allottee) in construction lots & furniture: four lots of civil engineers and buildings, one global system lot, one tunnel lot, and one material lot.

Filming zone: 

– Line E: Saida Bougatfa in Manoubia: 6.3KM of tracks, nine pedestrian crossings, and five engineering structures.

– Line D: Tunis Ville in Gobaa: 12.2KM of tracks, 13 pedestrian crossings, and ten engineering structures.

Project Objectives:

Our project aims to highlight: 

The magnitude of the project

Construction site follow up 

Human resources

The know-how of Colas Rail 

About the project

Construction site follow-through
December 2020

Filming crew:
DOP – Director – Director’s assistant
Cameramen – Drone pilot